Stainless steel pipe is a hollow long round steel, which is widely used in petroleum, chemical, medical, food, light industry, machinery and instrumentation and other industrial pipelines and mechanical structural parts. In addition, when the bending and torsion strength are the same, the weight is lighter, so it is also widely used in the manufacture of mechanical parts and engineering structures. It is also often used as furniture and kitchenware.
Stainless steel pipe is a hollow long round steel, which is widely used in petroleum, chemical, medical, food, light industry, mechanical instrumentation and other industrial pipelines and mechanical structural parts. In addition, when the bending and torsion strength are the same, the weight is lighter, so it is also widely used in the manufacture of mechanical parts. and engineering structures. Also often used as furniture and kitchen utensils.
Alloy 310S (UNS S31000) is an austenitic stainless steel developed for use in high temperature corrosion resistant applications. The alloy resists oxidation up to 2010oF (1100oC) under mildly cyclic conditions.
310S (UNS S31008) is the low carbon version of the alloy. It is utilized for ease of fabrication. 310H (UNS S31009) is a high carbon modification developed for enhanced creep resistance. In most instances the grain size and carbon content of the plate can meet both the 310S and 310H requirements.
Alloy 310S can be easily welded and processed by standard shop fabrication practices
- Outside Diameter: 4mm to 2500mm(1/8”inch-120”inch)
- Wall Thickness: Sch5S-SchXXS(1mm-150mm)
- Material: 201, 202, 301, 304, 304L, 309S, 310, 316, 316L, 321, 410S, 420, 430, 904L, etc
- Surface: Black, bright, hot rolling, hot forging, pickling white, sandblasting, peeling, rough turning, grinding, centerless grinding
- Standard: JIS, AISI, ASTM, GB, DIN, EN, etc
- Certification: ISO, SGS, BV
- Stock: 5000 Ton/Month
- Quality control: Third Part Inspection is acceptable.
- Delivery Time: Within 5- 7 working days for our stock size, after receiving first two payment installation of 30% each, 15-20days for our production according to customers’ quantities